In 2020-2021, Equinor awarded Head Energy a concept study for waste-water treatment system at Mongstad.

Contract type: Main Engineering and Integrator, Concept Study
Duration: 2020–2021
Manhours: 10.000 manhours

  • Total System Engineering
  • Interface coordination towards Civil Contractor and two Technology Vendors for water treatment
  • Concept Selection

-This is the first study-contract with Equinor for modifications of the Mongstad Base.
We look forward to starting and are eager to build a solid foundation for the execution phase, says CEO of Head Energy Group, Morten Leikvoll.

-This is both a challenging and interesting project for our team and a good fit with our execution model. We are very proud to have gained the confidence of Equinor and hope that this will be the start of a long term-cooperation